User Tools

Site Tools


melange:schedule

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
melange:schedule [2020/04/21 19:00]
sanjay
melange:schedule [2020/04/21 19:01]
sanjay
Line 19: Line 19:
 |  12|  04/07/2020  | No meeting |  | |  12|  04/07/2020  | No meeting |  |
 |  13|  04/14/2020  | Glow: Graph Lowering Compiler Techniques for Neural Networks: https://arxiv.org/pdf/1805.00907.pdf | Louis Narmour | |  13|  04/14/2020  | Glow: Graph Lowering Compiler Techniques for Neural Networks: https://arxiv.org/pdf/1805.00907.pdf | Louis Narmour |
-|  14|  04/21/2020  Simplifying reductions, Gautam Gupta and Sanjay Rajopadhye (POPL 2006) +|  14|  04/21/2020  | Simplifying reductions, Gautam Gupta and Sanjay Rajopadhye (POPL 2006) https://dl.acm.org/doi/abs/10.1145/1111037.1111041 | Sanjay |
-    https://dl.acm.org/doi/abs/10.1145/1111037.1111041 | Sanjay |+
 |  15|  04/28/2020  | Co-optimizing memory-level parallelism and cache-level parallelism: https://dl.acm.org/doi/10.1145/3314221.3314599 | Brandon Gildemaster | |  15|  04/28/2020  | Co-optimizing memory-level parallelism and cache-level parallelism: https://dl.acm.org/doi/10.1145/3314221.3314599 | Brandon Gildemaster |
 |  16|  05/05/2020  |  | Alexandre | |  16|  05/05/2020  |  | Alexandre |
melange/schedule.txt · Last modified: 2022/04/26 09:34 by corentin